Thư viện tri thức trực tuyến
Kho tài liệu với 50,000+ tài liệu học thuật
© 2023 Siêu thị PDF - Kho tài liệu học thuật hàng đầu Việt Nam

Luận văn thạc sĩ UEH high turnover rate of petrovietnam in malaysia project
Nội dung xem thử
Mô tả chi tiết
UNIVERSITY OF ECONOMICS HO CHI MINH CITY
International School of Business
------------------------------
TRẦN THỊ MỸ YẾN
HIGH TURNOVER RATE OF
PETROVIETNAM IN MALAYSIA
PROJECT
MASTER OF BUSINESS ADMINISTRATION
Ho Chi Minh City – Year 2018
LUAN VAN CHAT LUONG download : add [email protected]
UNIVERSITY OF ECONOMICS HO CHI MINH CITY
International School of Business
------------------------------
TRẦN THỊ MỸ YẾN
HIGH TURNOVER RATE OF
PETROVIETNAM IN MALAYSIA
PROJECT
MASTER OF BUSINESS ADMINISTRATION
SUPERVISOR: LÊ THỊ THANH XUÂN
Ho Chi Minh City – Year 2018
LUAN VAN CHAT LUONG download : add [email protected]
1
ABSTRACT
This thesis study high turnover rate in purchasing department of PVE, its reasons and its
effect on company’s performance. Turnover rate is more and more considered as an
important factor to any business. In depth interview was used to collect and analyze data
of the study. From the result of interviews, high turnover rate really exists in the company.
The three consequences of high turnover rate are productivity loss, delay of schedule, and
turnover intention. Job satisfaction in terms of pay and organizational commitment in terms
of affective commitment were found to have negative relationship with high turnover rate.
This study also provides solutions and implementation plans for PVE to reduce turnover
rate and increase its performance.
I. INTRODUCTION
1. Company Profile
Background
Petrovietnam Investment Consultancy and Design JSC (PVE) was set up from the
equalization of State-owned Petroleum Investment Consultant Company (PVICC). April
10, 1998 from the equalization of State Owned Enterprise. Vietnam Petroleum Corporation
(Petrovietnam)... In 2005, Petro Vietnam Engineering (PVE) turned into a Joint Stock
Company. Also, in 2011, hierarchical structure is exchanged to Mother - Mother
Subsidiary. The oil and gas industry are a key industry in the nation, with potential for
improvement in the coming years. PetroVietnam's technique keeps on connecting with
global markets, open doors for PVE to infiltrate remote markets through PVN's tasks. Right
now, PVE has been allotted by Petro Vietnam to do numerous significant activities in the
business. Particularly, after the consummation of the change into the parent-backup
demonstrate, PVE reinforced its situation in the non-oil fields. It working in wander and
building consultancy for oil and gas, civil and industrial projects.
LUAN VAN CHAT LUONG download : add [email protected]
2
Key business activities:
Consulting on topographic survey, geological survey, current status survey, NDT
test and technical services for offshore and offshore oil and gas, deep-water projects
and other industrial projects.
Consultancy on management of construction investment projects, supervision of
projects belonging to the group or units of the Group, including projects on oil and
gas, biofuels and other specialized projects.
Implementing EPC services, providing project management and supervisory
services in upstream and downstream oil and gas and other industrial projects;
Providing consulting services on geological topography and non-destructive
inspection and testing for industrial and petroleum projects’
Organization
PVE’s mission
PV Engineering's mission is to become the number one corporation in Vietnam and one of
the leading companies in the region, providing high quality services at competitive prices
to meet the needs of all customers. Inside and outside Petro Vietnam.
LUAN VAN CHAT LUONG download : add [email protected]
3
2. Problem Analysis
Problem context
In 2015, PVE become sub-contractor of TECHNICAS in RAPID project in Malaysia with
contract value over 51 million USD in 4 packages: SMP, E & I, Painting, Fire Proofing,
Civil. The RAPID project is one of the largest scale refinery projects in the world. This
petrochemical refinery has a capacity of 300,000 barrels per day and supplies naphtha and
gas to petrochemical complexes and produces petrol and oil according to European
standards. Petrochemicals to increase the value of olefins from water separation towers and
the production of commercial petrochemical products including propane, polyethylene,
synthetic rubber. In the domestic market, PVE has relatively few competitors, mainly
foreign ones. Therefore, the expansion of the Malaysian market will be an opportunity for
PVE to improve its capacity as well as its position.In order to serve the project
implementation, PV Engineering has the need of recruiting 250 engineers and 500 workers
who have experience and project ad speak English fluently from difference position to
work through recruitment website and newspaper. In the first time of project, PVE try to
recruit the local worker but the salary is quite high and they did not hard working if
compare with Vietnamese worker. After that, PVE - human resource change the plan to
recruit Vietnamese engineer and worker to save money and achieve better results.
- Working condition:
+ The working time starts from 7:30 am to 10 pm, from Monday to Saturday.
+ Transportation: From the living place to job site take 40 minutes by bus.
- Compensation: The Company will pay for food, house allowance and ticket back to
Vietnam every six months working. Benefit: one-month salary for bonus every end of Year
if working above 1 year.
- Living condition:
+ Accommodation: The Company rents the staff for a 40 'ride to the site
LUAN VAN CHAT LUONG download : add [email protected]