Plain English
Parallel tasks
Two or more tasks that can be undertaken at the same time. This doesn't imply
that they have the same starting and ending times.
Dependent tasks are those that cannot begin until something else occurs. If you are constructing a
building, you first have to lay the foundation. Then, you can build the first floor, the second floor,
and the third floor. Obviously, you can't start with the fifth floor and then move to the third, not in
three-dimensional space as we know it.
Plain English
Dependent task
A task or subtask that cannot be initiated until a predecessor task or several
predecessor tasks are finished. Predecessor task Task that must be completed
before another task can commence.
The WBS is not the best tool for identifying the relationship between interdependent tasks. When
preparing a WSB outline, you want to proceed in chronological order, much as you want to do with
the tree approach. When you combine the outline and tree diagram type WBS, you end up with an
extended outline describing the tasks and subtasks associated with the elements on the tree
diagram. Thereafter, you can alter the position of the boxes to be in alignment with what takes
place and when. Hence, parallel tasks are on the same position on the chart. As you can see in
the figure below, some items, such as assignment and resource, occur at the same time.
Adding detail to the WBS sequence.