Thư viện tri thức trực tuyến
Kho tài liệu với 50,000+ tài liệu học thuật
© 2023 Siêu thị PDF - Kho tài liệu học thuật hàng đầu Việt Nam

Giáo trình hệ điều hành AIX tập 2
Nội dung xem thử
Mô tả chi tiết
Power Systems for AIX I:
LPAR Configuration and
Planning
(Course code AN11)
Instructor Guide
ERC 1.0
V5.3
cover
Front cover
Instructor Guide
June 2009 edition
The information contained in this document has not been submitted to any formal IBM test and is distributed on an “as is” basis without
any warranty either express or implied. The use of this information or the implementation of any of these techniques is a customer
responsibility and depends on the customer’s ability to evaluate and integrate them into the customer’s operational environment. While
each item may have been reviewed by IBM for accuracy in a specific situation, there is no guarantee that the same or similar results will
result elsewhere. Customers attempting to adapt these techniques to their own environments do so at their own risk.
© Copyright International Business Machines Corporation 2009. All rights reserved.
This document may not be reproduced in whole or in part without the prior written permission of IBM.
Note to U.S. Government Users — Documentation related to restricted rights — Use, duplication or disclosure is subject to restrictions
set forth in GSA ADP Schedule Contract with IBM Corp.
Trademarks
The reader should recognize that the following terms, which appear in the content of this
training document, are official trademarks of IBM or other companies:
IBM® is a registered trademark of International Business Machines Corporation.
The following are trademarks of International Business Machines Corporation in the United
States, or other countries, or both:
Adobe is either a registered trademark or a trademark of Adobe Systems Incorporated in
the United States, and/or other countries.
Intel is a trademark or registered trademark of Intel Corporation or its subsidiaries in the
United States and other countries.
Java and all Java-based trademarks and logos are trademarks of Sun Microsystems, Inc.
in the United States, other countries, or both.
Linux® is a registered trademark of Linus Torvalds in the United States, other countries, or
both.
Microsoft, Windows and Windows NT are trademarks of Microsoft Corporation in the
United States, other countries, or both.
UNIX® is a registered trademark of The Open Group in the United States and other
countries.
AIX® AIX 5L™ AS/400®
BladeCenter® eServer™ EnergyScale™
Express™ Focal Point™ GPFS™
HACMP™ i5/OS® IBM Systems Director Active
Energy Manager™
Micro-Partitioning™ OpenPower® OS/400®
POWER® POWER4™ POWER5™
POWER5+™ POWER6™ POWER Hypervisor™
Power Systems™ PowerPC® PowerVM™
pSeries® Redbooks® Resource Link™
RS/6000® System i® System i5®
System p® System p5® System Storage™
System z® TotalStorage®
Instructor Guide
Course materials may not be reproduced in whole or in part
without the prior written permission of IBM.
iii PowerVM Virtualization I © Copyright IBM Corp. 2009
Other company, product, or service names may be trademarks or service marks of others.
Instructor Guide
Course materials may not be reproduced in whole or in part
without the prior written permission of IBM.
iv PowerVM Virtualization I © Copyright IBM Corp. 2009
Instructor Guide
V5.3
TOC
Course materials may not be reproduced in whole or in part
without the prior written permission of IBM.
©Copyright IBM Corp. 2009 Contents v
Contents
Trademarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xiii
Instructor course overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xv
Course description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xvii
Agenda . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xix
Unit 1. Introduction to partitioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
Unit objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
What is a partition? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
Physical partition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7
Logical partition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10
Partition characteristics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-13
Partition resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-15
Logical partition resource example . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-18
IBM POWER5+ LPAR-capable systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-20
IBM POWER6 LPAR-capable systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-22
Benefits of using partitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-24
Software licensing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-28
POWER Hypervisor functions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-31
Hardware Management Console . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-34
The big picture . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-37
Advanced partition features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-39
Dynamic partitioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-41
How DLPAR works . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-44
Processor concepts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-47
Micro-partitioning: Shared processor pool . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-50
Multiple shared processor pools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-52
Virtual I/O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-55
Virtual I/O example . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-58
Integrated Virtual Ethernet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-61
Integrated Virtual Ethernet example . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-63
Live partition mobility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-65
Capacity on Demand . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-67
PowerVM editions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-70
Partitioning concepts summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-73
Integrated Virtualization Manager . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-76
LPAR configuration process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-79
Logical partition references . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-82
AN11 course content . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-85
AN30 course content . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-87
Checkpoint (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-89
Checkpoint (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-91
Instructor Guide
Course materials may not be reproduced in whole or in part
without the prior written permission of IBM.
vi PowerVM Virtualization I ©Copyright IBM Corp. 2009
Exercise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-93
Unit summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-95
Unit 2. Hardware system overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-1
Unit objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-2
IBM POWER5+ processor-based systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-4
IBM System p5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-7
IBM POWER6 processor-based systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-9
IBM Power Systems: The new Power equation . . . . . . . . . . . . . . . . . . . . . . . . . . .2-13
POWER6 system example: IBM Power 550 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-17
Power System 550 I/O slots: Example . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-20
I/O drawer options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-23
Location codes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-26
Physical location code convention . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-29
AIX location codes (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-32
AIX location codes (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-34
Service processor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-36
Advanced System Management Interface (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . .2-39
Advanced System Management Interface (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . .2-42
ASMI example . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-44
Checkpoint (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-48
Checkpoint (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-50
Exercise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-52
Unit summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-54
Unit 3. Hardware Management Console . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-1
Unit objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-3
3.1. HMC configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-5
Topic 1 objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-6
Hardware Management Console . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-8
HMC connection to the server . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-11
HMC version 7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-14
Configuring a new HMC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-17
Guided Setup Wizard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-20
HMC pre-login welcome screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-22
HMC login sessions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-24
Disconnect versus logoff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-26
Reconnecting to login session (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-28
Reconnecting to login session (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-30
HMC Welcome screen, after login . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-32
HMC V7 user interface: Overall structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-35
Flexibility: Launching tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-38
Server table view . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-41
LPAR table view . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-43
LPAR consoles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-45
HMC online help and documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-48
HMC V7 documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-50
Work area: Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-53
Instructor Guide
V5.3
TOC
Course materials may not be reproduced in whole or in part
without the prior written permission of IBM.
©Copyright IBM Corp. 2009 Contents vii
Toolbar features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-55
Flexibility: Filtering columns . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-57
Flexibility: Sort options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-59
Flexibility: Custom groups . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-61
Status overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-63
SRC lookup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-65
HMC management: Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-67
HMC network configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-70
Network settings: Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-73
Network settings: LAN Adapters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-76
Network settings: LAN Adapter details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-78
Network settings: LAN firewall . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-82
Network Settings: Name Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-85
Network settings: Routing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-87
Connecting HMC to managed system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-90
Add managed system (1 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-94
Add managed system (2 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-96
Add managed system (3 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-99
Managing the server or HMC connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-101
Check managed system status . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-104
Check HMC software version . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-107
Let’s review Topic 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-109
3.2. HMC users, remote access, and security. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-111
Topic 2: HMC users, remote access, and security . . . . . . . . . . . . . . . . . . . . . . . 3-112
HMC user management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-114
Add or manage HMC users . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-117
Add an HMC user (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-120
Add an HMC user (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-124
HMC users: Resources and task roles example . . . . . . . . . . . . . . . . . . . . . . . . . 3-126
Task roles management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-128
Add task role example . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-130
Managed resource roles management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-132
Add managed resource role example . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-134
HMC remote access options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-136
Enabling remote browser access . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-139
Remote HMC login: Browser requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-141
Enable or disable remote options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-144
Using HMC commands remotely . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-147
HMC commands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-149
SSH login environment on the HMC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-151
HMC CLI: What is available then? (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-153
HMC CLI: What is available then? (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-156
Remote access security overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-160
Browser access: SSL security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-163
HMC management: Manage certificates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-165
Integrated Virtualization Manager . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-168
The IVM architecture . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-171
The big picture with IVM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-174
Instructor Guide
Course materials may not be reproduced in whole or in part
without the prior written permission of IBM.
viii PowerVM Virtualization I ©Copyright IBM Corp. 2009
IVM LPAR management: Common Web interface . . . . . . . . . . . . . . . . . . . . . . . .3-177
IVM administration from GUI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-179
Let’s review Topic 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-181
Checkpoint (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-183
Checkpoint (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-185
Exercise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-187
Unit summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-189
Unit 4. System Planning Tool . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-1
Unit objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-2
IBM System Planning Tool (SPT) overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-4
SP Tool and system plan deployment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-8
SPT: Launch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-11
SPT: System attributes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-13
SPT: DASD/Media backplane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-15
SPT: System Partitions definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-17
SPT: Processors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-19
SPT: Memory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-21
SPT: System Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-23
SPT: Working with the Planned Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-25
SPT: Assigning Hardware devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-27
SPT: Networking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-29
SPT: Virtual Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-32
SPT: LPAR’s operating system installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-35
SPT: Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-38
SPT: Configuration status (reports and output) . . . . . . . . . . . . . . . . . . . . . . . . . . .4-40
Import system plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-42
Deploy system plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-44
Create a system plan using HMC version 7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-46
Converting a system-plan file to SPT format . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-49
Checkpoint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-51
Exercise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-53
Unit summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-55
Unit 5. HMC and managed system maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-1
Unit objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-3
Backup critical console data (1 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-5
Backup critical console data (2 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-8
Backup critical console data (3 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-11
Scheduling backups (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-14
Scheduling backups (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-16
HMC corrective service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-19
Install corrective service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-22
HMC software upgrades . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-25
Prepare for HMC software upgrades . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-28
HMC reload procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-30
Managed system firmware update (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-33
Managed system firmware update (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-36
Instructor Guide
V5.3
TOC
Course materials may not be reproduced in whole or in part
without the prior written permission of IBM.
©Copyright IBM Corp. 2009 Contents ix
Examine current firmware level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-39
Obtaining new firmware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-42
Change LIC for current release (1 of 5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-45
Change LIC for current release (2 of 5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-48
Change LIC for current release (3 of 5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-51
Change LIC for current release (4 of 5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-53
Change LIC for current release (5 of 5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-55
Checkpoint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-57
Exercise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-59
Unit summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-61
Unit 6. System power management. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
Unit objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2
Managed System Power States . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4
Managed system power on and off . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7
Managed system power on options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10
Partition standby . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13
System profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-15
Partition auto start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18
Hardware Discovery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-21
System initialization (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-23
System initialization (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-26
Power off managed system (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-28
Power off managed system (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-31
Power Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-34
Checkpoint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-37
Exercise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-39
Unit summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-41
Unit 7. Planning and configuring logical partitions . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1
Unit objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-3
Partition resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5
Dividing the system resources (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-7
Dividing the system resources (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-10
Creating partitions and profiles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-14
Memory resources (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-16
Memory resources (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-19
Memory usage (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-22
Memory usage (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-26
Processor resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-29
I/O resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-33
Virtual SCSI devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-36
Virtual Ethernet options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-39
Create a logical partition: System state . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-41
Create logical partition wizard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-43
Partition ID and name . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-45
Profile name . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-48
Set processor type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-51
Instructor Guide
Course materials may not be reproduced in whole or in part
without the prior written permission of IBM.
x PowerVM Virtualization I ©Copyright IBM Corp. 2009
Configure dedicated processors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-53
Configure shared processors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-55
Configure memory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-57
Configure I/O slots . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-59
Virtual I/O adapters setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-61
Logical Host Ethernet Adapter (1 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-64
Logical Host Ethernet Adapter (2 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-67
Logical Host Ethernet Adapter (3 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-69
Optional settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-71
Check logical partition profile summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-74
Editing a partition’s configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-76
Additional configuration options (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-79
Additional configuration options (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-81
Checkpoint (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-84
Checkpoint (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-86
Exercise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-88
Unit summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-90
Unit 8. Partition operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-1
Unit objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-2
Web-based user interface: Systems management . . . . . . . . . . . . . . . . . . . . . . . . . .8-4
Activating partitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-9
Activate partitions with a system profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-11
Activating an individual partition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-14
Activating with open terminal window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-18
Terminal window: Normal boot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-21
Activating with advanced options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-24
Open or close a terminal window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-26
Stopping a partition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-29
Partition shutdown options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-31
Restart partition options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-34
Create a system profile (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-37
Create a system profile (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-39
Validate allocations with a system profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-42
Change the default partition profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-44
Copy a partition profile (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-46
Copy a partition profile (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-48
Save configuration in a partition profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-50
Modify a partition profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-52
Delete a partition profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-55
Delete a partition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-57
Partition availability priority (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-59
Partition availability priority (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-62
Backing up partition profile data (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-64
Backing up partition profile data (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-67
Restoring partition profile data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-69
Removing backup files . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-72
Scheduling operations (1 of 4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-74
Instructor Guide
V5.3
TOC
Course materials may not be reproduced in whole or in part
without the prior written permission of IBM.
©Copyright IBM Corp. 2009 Contents xi
Scheduling operations (2 of 4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-76
Scheduling operations (3 of 4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-79
Scheduling operations (4 of 4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-82
Troubleshooting activation failures (1 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-84
Troubleshooting activation failures (2 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-86
Troubleshooting activation failures (3 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-89
Managed system properties (1 of 9) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-92
Managed system properties (2 of 9) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-94
Managed system properties (3 of 9) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-97
Managed system properties (4 of 9) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-99
Managed system properties (5 of 9) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-102
Managed system properties (6 of 9) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-106
Managed system properties (7 of 9) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-108
Managed system properties (8 of 9) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-111
Managed system properties (9 of 9) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-114
Checkpoint (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-118
Checkpoint (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-120
Exercise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-122
Unit summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-124
Unit 9. Dynamic resource allocation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1
Unit objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3
9.1. Dynamic LPAR operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-5
Topic 1: Dynamic LPAR operations objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6
Dynamic logical partitioning (DLPAR) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-8
DLPAR operations overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-12
DLPAR operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-15
Add/Remove dedicated processor operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-17
Add/Remove shared processing units operation . . . . . . . . . . . . . . . . . . . . . . . . . . 9-20
DLPAR status (1 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-23
DLPAR status (2 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-25
DLPAR status (3 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-27
Move Memory operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-29
Add I/O slots operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-32
AIX commands for I/O operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-34
Removing I/O slots in AIX (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-37
Removing I/O slots in AIX (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-39
Move/Remove I/O slots operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-43
LHEA dynamic operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-45
Move/Remove an LHEA from the logical partition . . . . . . . . . . . . . . . . . . . . . . . . . 9-47
chhwres HMC command for DLPAR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-50
List resources with lshwres command . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-52
Let’s review Topic 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-55
Exercise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-57
9.2. DLPAR troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-59
Topic 2: DLPAR troubleshooting objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-60
How DLPAR works . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-62
Reliable Scalable Cluster Technology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-65
Instructor Guide
Course materials may not be reproduced in whole or in part
without the prior written permission of IBM.
xii PowerVM Virtualization I ©Copyright IBM Corp. 2009
Resource managers (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-67
Resource managers (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-70
HMC and LPAR initial communication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-73
HMC and LPAR authentication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-76
Verifying HMC for DLPAR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-79
RMC management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-81
Viewing resource class information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-85
Reinitializing RMC configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-87
DLPAR troubleshooting: Symptoms (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-89
DLPAR troubleshooting: Symptoms (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-92
DLPAR troubleshooting: Network setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-95
Let’s review Topic 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-97
Checkpoint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-99
Exercise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-101
Unit summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-103
Appendix A. Checkpoint solutions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1
Instructor Guide
Course materials may not be reproduced in whole or in part
without the prior written permission of IBM.
© Copyright IBM Corp. 2009 Trademarks xiii
V5.3
TMK Trademarks
The reader should recognize that the following terms, which appear in the content of this
training document, are official trademarks of IBM or other companies:
IBM® is a registered trademark of International Business Machines Corporation.
The following are trademarks of International Business Machines Corporation in the United
States, or other countries, or both:
Adobe is either a registered trademark or a trademark of Adobe Systems Incorporated in
the United States, and/or other countries.
Intel is a trademark or registered trademark of Intel Corporation or its subsidiaries in the
United States and other countries.
Java and all Java-based trademarks and logos are trademarks of Sun Microsystems, Inc.
in the United States, other countries, or both.
Linux® is a registered trademark of Linus Torvalds in the United States, other countries, or
both.
Microsoft, Windows and Windows NT are trademarks of Microsoft Corporation in the
United States, other countries, or both.
UNIX® is a registered trademark of The Open Group in the United States and other
countries.
Other company, product, or service names may be trademarks or service marks of others.
AIX® AIX 5L™ AS/400®
BladeCenter® eServer™ EnergyScale™
Express™ Focal Point™ GPFS™
HACMP™ i5/OS® IBM Systems Director Active
Energy Manager™
Micro-Partitioning™ OpenPower® OS/400®
POWER® POWER4™ POWER5™
POWER5+™ POWER6™ POWER Hypervisor™
Power Systems™ PowerPC® PowerVM™
pSeries® Redbooks® Resource Link™
RS/6000® System i® System i5®
System p® System p5® System Storage™
System z® TotalStorage®
Instructor Guide
Course materials may not be reproduced in whole or in part
without the prior written permission of IBM.
xiv PowerVM Virtualization I © Copyright IBM Corp. 2009
Instructor Guide
Course materials may not be reproduced in whole or in part
without the prior written permission of IBM.
© Copyright IBM Corp. 2009 Instructor course overview xv
V5.3
pref Instructor course overview
This course is an introduction to performing system administration in a
Power Systems p environment. It will provide the students with an
overview of basic LPAR terminology, planning and configuration tasks
associated with an IBM Power System. Additionally, the course covers
configuration rules for partitions running either AIX V5.2, AIX V5.3, AIX
V6.1, or Linux.
This is a 3-day course with checkpoint questions and hands-on
exercises at the end of each unit to check the students’ understanding
of the materials.
This course has been designed to support the Version 7.3 of the
Hardware Management Console (HMC) software.
Course strategy
The course purpose is to give new IBM customers the knowledge to
configure and manage partitions. For the students, no previous
knowledge of logical partitioning is expected.
The course design strategy is to define basic terms and concepts
related to logical partitioning, cover key configuration information for
the HMC, and explain how to configure the logical partitioning options.
Each unit contains a list of review questions on the last page. Use
these to review the material from the units that you covered on the
previous day each morning for the first 20-30 minutes.